NCCCO TEST QUESTIONS • WITH ANSWERS

NCCCO Test Questions and Answers
50 Free Sample Questions

Practice crane operator exam questions on every Core topic. Pick your answer, then open the explanation to see if you were right and why.

Reviewed November 2026 against the CCO Mobile Crane Operator Candidate Handbook exam outline.

Below are 50 sample NCCCO (CCO) test questions with answers, covering the topics on the mobile crane Core written exam. They are original practice questions, not CCO's own. The real Core exam has 95 questions in 90 minutes with no calculator.

Definitions Questions

1. What is the rated load of a crane?

  1. AThe maximum static vertical load for which the crane or hoist is designed
  2. BThe average load handled per shift
  3. CThe load at which the limit switch trips
  4. D125% of the test load
Show answer

Answer: A. The maximum static vertical load for which the crane or hoist is designed. Rated load is the maximum static vertical load for which a crane or an individual hoist is designed; any hook load greater than this is an overload.

2. Which of these best defines duty cycle work?

  1. ARepetitive lifting operations where speed is important, such as dragline, clamshell, steel erection, and concrete placement
  2. BAny lift exceeding 75 percent of chart capacity
  3. COperating the crane more than one shift per day
  4. DLifts made with two or more cranes sharing a load
Show answer

Answer: A. Repetitive lifting operations where speed is important, such as dragline, clamshell, steel erection, and concrete placement. Duty cycle is defined as repetitive lifting where speed matters — dragline, clamshell, steel erection, and concrete placement — which adds dynamic loads and wear.

3. A crane carrier differs from a commercial truck vehicle because it is…

  1. ANot designed to transport personnel, materials, or equipment other than the crane superstructure
  2. BAlways equipped with crawler tracks
  3. CLimited to 25 mph on highways
  4. DNever fitted with outriggers
Show answer

Answer: A. Not designed to transport personnel, materials, or equipment other than the crane superstructure. A crane carrier is an undercarriage built solely to transport the rotating superstructure, unlike a commercial truck that can haul other material.

Crane Types Questions

4. Truck crane capacities are usually greatest over the…

  1. ARear
  2. BFront
  3. CLeft side
  4. DRight side
Show answer

Answer: A. Rear. Most truck cranes rate highest over the rear; check the work-area chart.

5. Crane companies supply two types of load capacity chart for barge or ship work. Which chart applies to a crane secured only to prevent shifting?

  1. AThe tipping capacity chart
  2. BThe strength capacity chart
  3. CThe pedestal mount chart
  4. DThe on-rubber chart
Show answer

Answer: A. The tipping capacity chart. A crane merely blocked against shifting is still stability-limited, so it uses tipping capacity. A crane bolted down as a pedestal crane is limited by component strength instead.

6. A barge crane's load chart and pre-lift test were established with the crane positioned at the center of the barge. What does that permit?

  1. ANothing — the crane must not be moved from that position
  2. BThe crane may be moved to the stern at the same rating
  3. CThe crane may be moved if capacity is cut 25 percent
  4. DThe crane may be moved as long as list stays under 5 degrees
Show answer

Answer: A. Nothing — the crane must not be moved from that position. Ratings depend on where the crane sits relative to the barge's buoyancy. If the chart and pre-lift test are based on a center position, moving the crane invalidates them; if they were based on a stern or forward position, the crane may be moved but the rating does not change.

General Knowledge Questions

7. What does the B10 life of an antifriction bearing represent?

  1. AThe minimum expected life in hours of 90% of a group of bearings at a given speed and loading
  2. BThe maximum life of the best 10% of bearings
  3. CThe average life of all bearings tested
  4. DThe warranty period offered by the manufacturer
Show answer

Answer: A. The minimum expected life in hours of 90% of a group of bearings at a given speed and loading. B10 life is the minimum expected life in hours of 90 percent of a group of bearings operating at a given speed and loading.

8. When a heavy load is lifted, what is the result?

  1. Aboom deflection
  2. Bincreased line pull
  3. Cdecreased line pull
  4. Dboom sag
Show answer

Answer: A. boom deflection. Lifting a heavy load causes the boom to deflect (flex), which also increases the load radius.

9. The majority of the ground crew deaths are related to:

  1. Aenergized power line contact
  2. Bstructural failure
  3. Cpersonnel platform contact
  4. Dimproper set up
Show answer

Answer: A. energized power line contact. Contact with energized power lines is the leading cause of crane-related deaths among ground crew.

Technical Knowledge Questions

10. Swinging rapidly makes the load…

  1. ADrift outward, increasing the radius and the tipping moment
  2. BHang closer to the boom
  3. CWeigh less
  4. DRise on its own
Show answer

Answer: A. Drift outward, increasing the radius and the tipping moment. Rapid swing slings the load outward past the boom tip — radius grows, capacity shrinks, and stopping the swing suddenly makes the load swing farther still. Swing slowly and smoothly.

11. The force required to actuate a crane's HAND controls must be less than what value?

  1. A35 pounds
  2. B10 pounds
  3. C50 pounds
  4. D75 pounds
Show answer

Answer: A. 35 pounds. Control effort limits keep the operator from fatiguing or over-travelling a lever during a long shift. Hand controls are limited to under 35 lb of force and foot controls to under 50 lb.

12. Which of these is classified as a special lifting operation requiring specific equipment and procedures?

  1. AMultiple load line use
  2. BLifting at less than half of rated capacity
  3. COperating with the jib stowed
  4. DLifting during daylight hours
Show answer

Answer: A. Multiple load line use. Special lifting operations include multiple crane lifts, lifting personnel, pick and carry operations, and multiple load line use.

Wire Rope Questions

13. On an ABW crane, running wire rope in service must be removed from service when it shows:

  1. ASix randomly distributed broken wires in one rope lay, or three broken wires in one strand in one lay
  2. BOne broken wire anywhere in the rope
  3. CAny surface discoloration
  4. DA slightly dusty appearance
Show answer

Answer: A. Six randomly distributed broken wires in one rope lay, or three broken wires in one strand in one lay. For running ropes, the standard removal criteria are 6 broken wires in one lay or 3 in one strand in one lay.

14. What are "pick-up points" on a wire rope?

  1. ASections repeatedly placed under stress when the initial load of each lift is applied, such as sections contacting sheaves
  2. BThe points where the rope attaches to the hook
  3. CThe locations where lubricant is applied
  4. DThe marked points used to measure rope length
Show answer

Answer: A. Sections repeatedly placed under stress when the initial load of each lift is applied, such as sections contacting sheaves. Pick-up points are rope sections repeatedly stressed as each lift starts, typically in contact with sheaves, and are critical inspection points.

15. What is the safe working load (SWL) of a wire rope defined as?

  1. Abreaking strength divided by safety factor
  2. Bbreaking strength times safety factor
  3. Cbreaking strength plus safety factor
  4. Dbreaking strength subtracted from safety factor
Show answer

Answer: A. breaking strength divided by safety factor. SWL is the breaking strength divided by the design safety factor — e.g., a rope with 50,000 lb breaking strength and a 5:1 factor has a 10,000 lb SWL.

Pitch Diameter Questions

16. Lacking a wire rope manufacturer's guidance, what is the rule-of-thumb minimum (critical) sheave diameter for a given wire rope?

  1. AAt least 20 times the rope diameter
  2. BAt least 6 times the rope diameter
  3. CAt least 10 times the rope diameter
  4. DAt least 40 times the rope diameter
Show answer

Answer: A. At least 20 times the rope diameter. Below roughly 20:1 the repeated bending and straightening of the wires drives premature fatigue failure. Manufacturer tables list higher preferred ratios for specific rope constructions.

17. Which sling type tolerates the TIGHTEST bend — that is, has the SMALLEST minimum D/d ratio?

  1. AAlloy chain sling (6 to 1)
  2. BMechanically spliced wire rope sling (25 to 1)
  3. CHand-tucked wire rope sling (15 to 1)
  4. DSynthetic fiber rope sling (8 to 1)
Show answer

Answer: A. Alloy chain sling (6 to 1). Superlative trap: the big 25 to 1 number is tempting, but a LARGER minimum D/d means the sling demands a GENTLER bend. Alloy chain's 6 to 1 is the smallest minimum, so chain tolerates the tightest bend.

18. When ROTATION-RESISTANT rope is run over the lower load block, its sheave pitch-diameter requirement rises from 16x to:

  1. A18 times the nominal rope diameter
  2. B15 times the nominal rope diameter
  3. C20 times the nominal rope diameter
  4. DIt stays at 16 times
Show answer

Answer: A. 18 times the nominal rope diameter. For rotation-resistant rope, the block sheave requirement increases to 18x, above the 16x used for standard rope.

Rigging Questions

19. Which natural fiber rope is the only grade normally accepted for construction rigging use?

  1. ANumber One grade manila
  2. BNumber One grade sisal
  3. CTarred hemp
  4. DCoir
Show answer

Answer: A. Number One grade manila. Other natural fibers are either too weak or deteriorate too quickly. Good manila is recognizable by its light yellow color; darker color means lower grade and lower strength.

20. If a multi-leg sling has hooks that are not needed for the lift, the correct practice is to:

  1. AProperly store the unused hooks or use a different sling — never lift with sling hooks hanging loose
  2. BLet the unused hooks dangle clear of the load
  3. CTie the spare hooks together with wire
  4. DHook them lightly to the load edge
Show answer

Answer: A. Properly store the unused hooks or use a different sling — never lift with sling hooks hanging loose. Never lift with sling hooks hanging loose; store unused hooks properly or choose a different sling. Likewise remove all slings and cables from crane hooks when not in use, since dangling gear can snag objects while the crane moves.

21. In the web sling designation 'EE 2-9 04 x 12', what does the '04' represent?

  1. ASling width in inches
  2. BNumber of plies
  3. CWebbing grade
  4. DSling length in feet
Show answer

Answer: A. Sling width in inches. The sequence is type (EE), number of plies (2), webbing grade (9), width in inches (04), then length in feet (12). Reading the tag correctly is the only way to confirm you have the sling you think you have.

ASME B30.9 (Slings) Questions

22. A synthetic web sling must be removed from service in basic rigging when it shows:

  1. ACuts, holes, broken or worn stitching, melting, or acid/heat damage
  2. BA manufacturer's tag that is still attached and legible
  3. CLight surface dirt from normal use
  4. DA rated capacity marked in pounds
Show answer

Answer: A. Cuts, holes, broken or worn stitching, melting, or acid/heat damage. Cuts, holes, broken stitching, heat/chemical damage, and a missing tag are removal criteria for synthetic web slings.

23. If a hand-tucked wire rope sling is proof tested, what proof load range applies?

  1. AMinimum 1 and maximum 1.25 times the single-leg vertical rated load
  2. BMinimum 2 and maximum 2.5 times the rated load
  3. CExactly 2 times the rated load
  4. DMinimum 4 times the rated load
Show answer

Answer: A. Minimum 1 and maximum 1.25 times the single-leg vertical rated load. Para. 9-2.6.2(a)(3): hand-tucked slings are proofed at 1 to 1.25 times; mechanical splice and socket slings at 2 to 2.5 times the single-leg vertical rating.

24. What minimum undisturbed rope length is required between the last tucks of tuck splices on a synthetic rope sling?

  1. A10 times the rope diameter
  2. B40 times the rope diameter
  3. C4 times the rope diameter
  4. D96 times the rope diameter
Show answer

Answer: A. 10 times the rope diameter. Para. 9-4.3.1(c): synthetic rope slings shall have a minimum undisturbed length of 10 rope diameters between the last tucks of tuck splices or ends of buried tails.

Load Calculation Questions

25. What is the approximate weight of stone concrete, and of reinforced stone concrete?

  1. A144 lbs/cu ft plain; 150 lbs/cu ft reinforced
  2. B100 lbs/cu ft plain; 110 lbs/cu ft reinforced
  3. C200 lbs/cu ft plain; 220 lbs/cu ft reinforced
  4. D62 lbs/cu ft plain; 75 lbs/cu ft reinforced
Show answer

Answer: A. 144 lbs/cu ft plain; 150 lbs/cu ft reinforced. Concrete (stone) is about 144 lb/cu ft; reinforced stone concrete is about 150 lb/cu ft (about 4050 lb per cubic yard).

26. Using the rule of thumb, what is the safe working load of a 3/4-inch wire rope sling?

  1. A4.5 tons
  2. B6 tons
  3. C2 tons
  4. D8 tons
Show answer

Answer: A. 4.5 tons. 0.75 x 0.75 x 8 = 4.5 tons.

Load Charts Questions

27. A plate mounted near the boom foot pins gives the distance from those pins to the center of rotation. How is it used?

  1. AAdd it to the measured distance from the boom foot out to the load center to get the total load radius
  2. BSubtract it from the boom length to get the effective boom length
  3. CIt is the minimum allowable radius for the crane
  4. DIt is used only for calculating ground bearing pressure
Show answer

Answer: A. Add it to the measured distance from the boom foot out to the load center to get the total load radius. Radius is always measured from the axis of rotation to the center of the load. Measuring from the boom foot and adding the plate's fixed offset gives an accurate radius when a tape cannot be run to the rotation center.

28. Which formula gives the gross load?

  1. AGross load = net load + deductions
  2. BGross load = net load - deductions
  3. CGross load = gross capacity - deductions
  4. DGross load = net capacity + net load
Show answer

Answer: A. Gross load = net load + deductions. Gross load equals the net load (the load's weight) plus deductions like blocks, balls, and rigging — useful for finding maximum allowable radius.

Site Setup Questions

29. Why can a truck crane impose higher ground pressure than a crawler crane of similar weight?

  1. AThe outrigger pads present a much smaller total bearing area than tracks
  2. BTruck cranes always weigh more than crawlers
  3. CRubber tires transmit more shock into the soil
  4. DTruck cranes are always rated at a longer radius
Show answer

Answer: A. The outrigger pads present a much smaller total bearing area than tracks. Ground pressure equals load divided by bearing area. Four small pads concentrate the same machine and load weight far more than two long tracks, so the soil under each pad must be proven capable.

30. Site preparation requires what minimum clearance between all portions of the crane and obstructions?

  1. A2 feet
  2. B1 foot
  3. C4 feet
  4. D6 feet
Show answer

Answer: A. 2 feet. The controlling entity must ensure adequate clearance — a minimum of 2 feet — between all portions of the crane and obstructions.

Power Lines Questions

31. Which sequence correctly rebuilds the Table A voltage bands, top to bottom?

  1. A50 · 200 · 350 · 500 · 750 · 1,000 kV
  2. B50 · 100 · 200 · 400 · 800 · 1,000 kV
  3. C50 · 250 · 450 · 650 · 850 · 1,000 kV
  4. D100 · 200 · 300 · 500 · 750 · 1,000 kV
Show answer

Answer: A. 50 · 200 · 350 · 500 · 750 · 1,000 kV. Voltage climbs +150 (50→200→350→500), then the step doubles-ish to +250 (750, 1,000) — same pivot row where distance shifts from +5 to +10.

32. Per Table T, the minimum traveling clearance for a power line rated over 50 kV up to 345 kV is…

  1. A10 feet
  2. B16 feet
  3. C20 feet
  4. D6 feet
Show answer

Answer: A. 10 feet. Table T requires 10 feet while traveling for lines over 50 to 345 kV; over 345 to 750 kV requires 16 feet.

Operation Aids Questions

33. An older crane that was built without an operational aid is required to have one installed at what point?

  1. AWhen the crane undergoes modification or repair
  2. BImmediately, regardless of its age
  3. COnly when it is sold to a new owner
  4. DNever — pre-existing cranes are permanently exempt
Show answer

Answer: A. When the crane undergoes modification or repair. The requirement is not retroactive on its own, but modifying or repairing the machine triggers the obligation to bring it up to the current aid requirement.

34. Which is an acceptable temporary alternative while a boom hoist limiting device is being repaired?

  1. AUse a boom angle indicator, or clearly mark the boom hoist cable
  2. BDerate the load chart by 20 percent
  3. CLimit boom angle to 60 degrees
  4. DPost an extra rigger at the load
Show answer

Answer: A. Use a boom angle indicator, or clearly mark the boom hoist cable. Temporary measures include using a boom angle indicator or marking the boom hoist cable so the operator or a spotter can stop the hoist in time.

Signals Questions

35. On a 'blind lift' where the load is out of the operator's line of sight, the operator should:

  1. AUse a qualified signal person or other approved communication throughout the lift
  2. BProceed slowly using best judgment alone
  3. CLift only if the load is light
  4. DHave the load moved into view by hand first
Show answer

Answer: A. Use a qualified signal person or other approved communication throughout the lift. When the operator cannot see the load or landing area, a signal person/reliable communication is required.

36. If the two-way radio link is lost or the operator loses sight of the signalperson using hand signals, what must happen?

  1. AThe operation must stop until the operator is signaled to resume
  2. BThe operator continues at reduced speed
  3. CThe operator lands the load wherever it is
  4. DA bystander takes over signaling
Show answer

Answer: A. The operation must stop until the operator is signaled to resume. If the radio link is lost or the operator loses sight of the signalperson, the operation must stop until the operator is properly signaled to resume.

Operations Questions

37. While slowly lifting, holding or lowering a load on the torque converter, what must the operator avoid doing?

  1. AEngaging any other clutch, because the added load will make the converter slip
  2. BIncreasing engine rpm above idle
  3. CWatching the drum rotation indicator
  4. DKeeping the hoist clutch engaged
Show answer

Answer: A. Engaging any other clutch, because the added load will make the converter slip. The converter is already near its slip point holding the load. Adding another driven function robs it of torque and the load starts to run away.

38. Before beginning a lift, who is responsible for verifying the weight of the load?

  1. AThe operator
  2. BThe shipping department
  3. CThe maintenance planner
  4. DThe safety officer
Show answer

Answer: A. The operator. The operator is responsible for verifying the load's weight before beginning operations, and most times the entire operation — operating, rigging, attaching and removing the load — is the operator's responsibility.

Mobile Crane Essentials Questions

39. Cranes on fully extended outriggers are normally rated at 85% of tipping. When a crane is designed to work with its outriggers at an intermediate (partly extended) position, how does the rating percentage for that position compare?

  1. ALower than 85%, because the crane will tip considerably sooner
  2. BStill 85%, since the outriggers are set and supported
  3. CHigher than 85%, since a shorter beam is stiffer
  4. DNot rated at all — intermediate positions are banned on every crane
Show answer

Answer: A. Lower than 85%, because the crane will tip considerably sooner. Retracting the outrigger beam pulls the tipping axis closer to the center of rotation, so the machine reaches its tipping point at a much lighter load. Charts for the 50% and 0% positions use a lower percentage of tipping than the 85% used at full extension, and the exact figure varies by manufacturer. Older cranes not designed for it had to be rated at 0% extension whenever the beams were not fully out.

40. Which OSHA standards cover rigging?

  1. ACFR 1910.184 and 1926.251
  2. BCFR 1910.180 and 1926.1400
  3. CCFR 1926.1431 only
  4. DCFR 1926.1400 and 1926.1431
Show answer

Answer: A. CFR 1910.184 and 1926.251. OSHA rigging standards are CFR 1910.184 (general industry) and 1926.251 (construction).

Inspections Questions

41. How often does O.S.H.A. require a written wire rope inspection?

  1. AOnce a month
  2. BOnce a shift
  3. COnce a week
  4. DOnce a quarter
Show answer

Answer: A. Once a month. OSHA 1910.179 requires a thorough inspection of running ropes at least once a month, with a written, dated, and signed report kept on file.

42. During wire rope inspections, which drum locations demand particular attention from the competent person?

  1. AFlange points, crossover points, and repetitive pickup points
  2. BOnly the rope anchor at the drum
  3. CThe midpoint of each rope layer
  4. DSections that never spool off the drum
Show answer

Answer: A. Flange points, crossover points, and repetitive pickup points. Critical review items include rope at flange points, crossover points, and repetitive pickup points on drums, plus terminal ends and reverse bends.

Standards Questions

43. Which ASME standard covers below-the-hook lifting devices such as lifting beams and coil hooks?

  1. AASME B30.20
  2. BASME B30.2
  3. CASME B30.16
  4. DASME B30.9
Show answer

Answer: A. ASME B30.20. ASME B30.20 is the standard for below-the-hook lifting devices; B30.2 covers overhead and gantry cranes and B30.9 covers slings.

44. OSHA 1926.251 covers…

  1. ARigging equipment for material handling
  2. BCrawler, locomotive, and truck cranes
  3. CHoisting personnel
  4. DSignals
Show answer

Answer: A. Rigging equipment for material handling. 1926.251 governs rigging equipment for material handling in construction.

OSHA 1926 Subpart CC Questions

45. According to OSHA 1926.1402, equipment must not be assembled or used unless ground conditions are:

  1. AFirm, drained, and graded sufficiently to meet the manufacturer's specifications for support and levelness
  2. BLevel within 5 percent grade in all directions
  3. CCompacted to 95 percent Proctor density
  4. DInspected and certified by a registered professional engineer
Show answer

Answer: A. Firm, drained, and graded sufficiently to meet the manufacturer's specifications for support and levelness. 1926.1402(b) requires ground that is firm, drained, and graded so that, with supporting materials if needed, the manufacturer's specifications for adequate support and degree of level are met.

46. According to OSHA 1926.1431, rigging hardware for suspending a personnel platform must support at least five times the maximum intended load, and where rotation resistant rope is used the slings must support at least:

  1. ATen times the maximum intended load
  2. BFive times the maximum intended load
  3. CThree times the maximum intended load
  4. DSeven times the maximum intended load
Show answer

Answer: A. Ten times the maximum intended load. 1926.1431(g)(3) requires rigging to support 5 times the maximum intended load, but 10 times where rotation resistant rope is used; wire rope sling eyes must have thimbles.

ASME B30.5 (Mobile Cranes) Questions

47. According to ASME B30.5 standard hand signals, EMERGENCY STOP is given by:

  1. ABoth arms extended, palms down, moving arms back and forth horizontally
  2. BOne arm extended, palm down, moving back and forth
  3. CClasping hands in front of the body
  4. DArm extended, thumb pointing down
Show answer

Answer: A. Both arms extended, palms down, moving arms back and forth horizontally. Figure 5-3.3.4-1 shows STOP as one arm extended palm down moving horizontally, and EMERGENCY STOP as both arms doing that motion.

48. According to ASME B30.5, on wheel-mounted cranes, no loads shall be lifted over the front area except:

  1. AAs specified by the crane manufacturer
  2. BWhen outriggers are set
  3. CWhen the load is less than 50% of capacity
  4. DDuring pick and carry operations
Show answer

Answer: A. As specified by the crane manufacturer. Para 5-3.2.1.5(f) prohibits lifting loads over the front area of wheel-mounted cranes except as specified by the crane manufacturer.

Standards & Violations Questions

49. Approximately how much capacity is lost by a long-boom crane working at minimum radius when it is only 1% out of level?

  1. AAbout 30 percent
  2. BAbout 5 percent
  3. CAbout 10 percent
  4. DAbout 50 percent
Show answer

Answer: A. About 30 percent. Out-of-level losses grow with boom length and shrink with radius. A long boom at minimum radius loses roughly 30% at 1% off level, about 41% at 2%, and about 50% at 3%.

50. Operating at or beyond rated capacity — including forgetting block, ball, and rigging deductions — violates…

  1. AOSHA 1926.1417 / ASME B30.5
  2. BOSHA 1926.1402
  3. CASME B30.9
  4. DOSHA 1910.184
Show answer

Answer: A. OSHA 1926.1417 / ASME B30.5. Capacity and operation rules live in 1926.1417 and ASME B30.5. Always work from net capacity: gross minus every deduction, for the actual configuration.

How to Use These Questions

  1. Answer before you look. Recognizing the right answer is easier than recalling it, and the exam asks you to recall.
  2. Read the reason, even when you're right. The same rule shows up on the exam worded three different ways.
  3. Note the topics you miss. Then study by exam weight with the NCCCO study guide.
  4. Move to timed practice. The Core practice test scores you by topic.

Study the Whole Exam, Not 20 Questions

5,000+ practice questions across Core and every specialty, load chart trainers with the rating table on screen, timed exam simulations, and the pass guarantee.

NCCCO Test Questions FAQ

Are these real NCCCO test questions?
No. CCO (NCCCO) does not release its exam questions, and anyone selling "the real test" is not selling the real test. These are original questions written to the topics in the official exam outline.
Is there an NCCCO test questions and answers PDF?
Not an official one with live exam questions. CCO publishes sample questions in its free candidate handbooks. Everything else, including this page, is practice material.
How many questions are on the NCCCO test?
The mobile crane Core exam has 95 multiple-choice questions in 90 minutes. Each specialty exam has 28 questions in 60 minutes.
What kind of questions are on the NCCCO Core exam?
Four-option multiple choice across four domains: Site (22%), Operations (28%), Technical Knowledge (23%) and Load Charts (27%). No calculator is allowed on Core.
What is a passing score on the NCCCO written exam?
CCO does not publish a percentage cut score. Aim for 80% or better in every topic on practice tests before you book.
Where can I get more NCCCO practice questions?
The free practice tests deal a fresh 20 questions each time, and the app has more than 5,000 across Core and every specialty.