Tower Crane Operator
Free Practice Test
Tower crane questions cover erection and climbing, operating in wind, trolley and hook work, and tower crane load charts.
Reviewed November 2026. 20 questions, answers explained, no sign-up.
What best describes a tower crane saddle jib?
- AA horizontal or slightly angled jib supported by pendant lines with a movable trolley carrying the hoist
- BA jib that raises and lowers to change radius with no trolley
- CA jib pivoted behind the tower with a fixed trolley
- DA telescoping jib supported by hydraulic cylinders
What This Test Covers
- ✓Erection, climbing and dismantling
- ✓Hammerhead and luffing jib cranes
- ✓Wind and weather limits
- ✓Trolley, hook and rope inspection
- ✓Tower crane load charts
- ✓Signals and communication
Want the full picture first? Read the tower crane operator certification guide.
20 Tower Crane Practice Questions With Answers
Read through these at your own pace. Pick an answer, then open the explanation. The scored test above deals a different set each time.
Tower Crane
1. What best describes a tower crane saddle jib?
- AA horizontal or slightly angled jib supported by pendant lines with a movable trolley carrying the hoist
- BA jib that raises and lowers to change radius with no trolley
- CA jib pivoted behind the tower with a fixed trolley
- DA telescoping jib supported by hydraulic cylinders
Show answer
Answer: A. A horizontal or slightly angled jib supported by pendant lines with a movable trolley carrying the hoist. The saddle (hammerhead) jib is held by pendants and changes radius by trolleying, which permits a smaller minimum operating radius than a luffing jib.
Tower — Erection & Structure
2. What is the first step taken before a tower crane is erected on a site?
- APrepare a site plan
- BOrder the counterweight blocks
- CChoose the bracing type
- DMeasure the height of nearby buildings
Show answer
Answer: A. Prepare a site plan. The site plan comes first and must show the crane location, swing radius relative to buildings and objects, buried sewers and water mains, powerline clearances, and the bracing methods to be used.
Tower — Operations
3. What does a tower crane's jib pendant tension overload switch do?
- ACuts hoisting power and stops trolley travel at a 5 percent overload sensed through pendant line tension
- BLimits how far the trolley can travel outboard
- CStops the jib from luffing past its maximum angle
- DApplies the travel brakes as the crane nears the end of the rail
Show answer
Answer: A. Cuts hoisting power and stops trolley travel at a 5 percent overload sensed through pendant line tension. When the load deflects the jib, pendant tension rises; at about 5 percent overload the switch cuts hoisting power and also stops trolley travel, since trolleying out would make the overload worse.
Tower — Ropes & Hooks
4. A tower crane speed table lists hoisting speeds for both 2-part and 4-part reeving. Going from 2-part to 4-part, what happens to the hoisting speeds and to the trolley speed?
- AHoisting speeds are roughly halved while trolley speed is unchanged
- BBoth hoisting and trolley speeds are halved
- CHoisting speeds are unchanged while trolley speed is halved
- DBoth hoisting and trolley speeds double
Show answer
Answer: A. Hoisting speeds are roughly halved while trolley speed is unchanged. Doubling the parts of line doubles capacity but halves hook travel for the same rope speed — creep, full-up and high-down figures all halve. Trolley traverse is driven separately and reads the same in both columns.
Tower Crane Test
5. Splices in rail tracks shall have:
- ASmooth joints
- BInvisible joints
- CMagnifluxed joints
- DPartial joints
Show answer
Answer: A. Smooth joints. Derived (no printed key): crane runway rail splice joints must be smooth/even so the travel wheels roll across without impact or shock loading.
Tower Crane
6. What is the preferred signaling method for tower crane operations?
- ATwo-way radio, with a hard-wired system preferred
- BHand signals from a single signalperson
- CFlags
- DAir horn codes
Show answer
Answer: A. Two-way radio, with a hard-wired system preferred. Hand signals are hard to identify over tower crane distances, so voice communication is preferred, and a hard-wire system is preferred over wireless because it cannot be lost to interference.
Tower — Erection & Structure
7. A fixed tower crane erected against a building must be braced how often as it rises?
- AAt least every four floors
- BAt least every two floors
- COnly at the very top
- DEvery eight floors
Show answer
Answer: A. At least every four floors. A building-supported fixed tower crane must be braced at least every four floors; inside a building it must be wedged every four floors.
Tower — Operations
8. Besides capacities, which of the following must a tower crane load rating chart include?
- AWire rope type, size and reeving with line pull, line speed and drum capacity, plus operating limits for windy or cold weather
- BThe names of authorized operators
- CThe date of the last concrete pour
- DThe site's emergency contact numbers
Show answer
Answer: A. Wire rope type, size and reeving with line pull, line speed and drum capacity, plus operating limits for windy or cold weather. The chart carries the crane's serial and model numbers and year, ratings for every configuration of tower height, jib length, radius and counterweight, rope and reeving data, and the wind and cold weather operating limits.
Tower — Ropes & Hooks
9. How many wraps of wire rope must remain on a tower crane hoist drum at all times?
- AAt least three wraps
- BAt least one wrap
- CAt least five wraps
- DNone, as long as the rope is anchored
Show answer
Answer: A. At least three wraps. At least three wraps of wire rope must always remain wound on the drum so the rope anchor is never the only thing holding the load.
Tower Crane Test
10. Which of the following is a temporary alternative measure (TAM) for a malfunctioning trolley travel limiting device?
- AMarking the trolley rope and using a spotter
- BJust relying on the end stops to stop trolley travel
- CUsing a spotter only
- DMarking the trolley rope only
Show answer
Answer: A. Marking the trolley rope and using a spotter. Answer key: a. & c. — marking the trolley rope and using a spotter.
Tower Crane
11. Which standard regulates construction tower cranes in the United States?
- AANSI/ASME B30.3
- BASME B30.5 mobile cranes
- CANSI A10.4
- DISO 898-1
Show answer
Answer: A. ANSI/ASME B30.3. Construction tower cranes are governed by the ANSI/ASME B30.3 standard.
Tower — Erection & Structure
12. As a climbing tower crane's height increases, how is the tower secured to the building?
- AIt is attached or wedged to the structure at least every four floors
- BIt is left free-standing to full height
- CIt is guyed with wire rope at every floor
- DIt is welded to the frame at each level
Show answer
Answer: A. It is attached or wedged to the structure at least every four floors. A climbing tower crane is supported by and attached to the building, tied or wedged to the structure at least every four floors as the building rises.
Tower — Operations
13. The jib pendant tension overload switch trips at a 5 percent overload. Besides cutting hoisting power, what else does it do?
- AStops trolley travel
- BReleases the slew brake
- CLowers the load automatically
- DApplies the rail travel brakes
Show answer
Answer: A. Stops trolley travel. When load weight deflects the jib and raises pendant line tension past 5 percent overload, the switch cuts hoist power and stops the trolley, preventing the operator from increasing the radius and the overload at the same time.
Tower — Ropes & Hooks
14. What device is required on all luffing-type tower cranes and must be visible to the operator?
- AA jib angle indicator
- BA trolley position gauge
- CA drum rotation counter
- DA slew ring thermometer
Show answer
Answer: A. A jib angle indicator. A jib angle indicator visible to the operator is required on all cranes with a luffing-type jib.
Tower Crane Test
15. If the qualified person decides that a part doesn't pose a safety hazard but needs to be monitored, the employer must ensure that it is checked in the monthly inspection and:
- AIs documented and the documentation is available to the person conducting the monthly inspection
- BIs inspected annually
- CIs part of the shift inspection
- DIs part of the daily inspection
Show answer
Answer: A. Is documented and the documentation is available to the person conducting the monthly inspection. Answer key: documented, with the documentation available to the person conducting the monthly inspection.
Tower Crane
16. Where must a load rating chart be located on a tower crane?
- AIn every cab, or attached to the control console if the crane is remote-operated
- BOnly in the site office
- COnly in the manufacturer's manual
- DBolted to the counterweight
Show answer
Answer: A. In every cab, or attached to the control console if the crane is remote-operated. A load chart must be in every cab, and for a remote-operated crane it must be attached to the control console unit.
Tower — Erection & Structure
17. Which guy-line attachment method around a tower leg is best?
- AWrapping the guy around a pipe
- BWrapping the guy directly on the sharp angle iron
- CWrapping the guy over a timber block only
- DKnotting the guy to itself
Show answer
Answer: A. Wrapping the guy around a pipe. For guy-line attachment, a pipe gives the best method, a timber block is better than bare steel, and running the wire directly over sharp angle iron is a do-not-use practice.
Tower — Operations
18. Why is cold-weather operation hazardous for tower cranes, and what temperature is considered a limit?
- ACold increases metal fatigue and shock loading can fracture components; about 0 degrees F (-17 C) is considered an operating limit
- BCold thickens the hoist rope lubricant, and 32 F is the limit
- CCold slows the electronics, and 20 F is the limit
- DCold has no real effect on steel cranes
Show answer
Answer: A. Cold increases metal fatigue and shock loading can fracture components; about 0 degrees F (-17 C) is considered an operating limit. Cold-weather flexing increases metal fatigue and shock loads can fracture components, and a temperature of about 0 F (-17 C) is considered an operating limit.
Tower — Ropes & Hooks
19. On the tower crane hoist drum, how must the hoist and trolley ropes be wound?
- AEvenly onto their drums, with correct spooling verified
- BLoosely so they can shift under load
- CIn crossed layers to save space
- DOnly on the outer half of the drum
Show answer
Answer: A. Evenly onto their drums, with correct spooling verified. Hoisting and trolley travel ropes must be wound evenly onto their drums, and correct spooling must be checked.
Tower Crane Test
20. Are self erecting tower cranes required to weathervane when out of service?
- AYes
- BDepends on weather forecast
- CDepends on ballast configuration
- DNever
Show answer
Answer: A. Yes. Answer key: Yes.
Study the Whole Exam, Not 20 Questions
5,000+ practice questions across Core and every specialty, load chart trainers with the rating table on screen, timed exam simulations, and the pass guarantee.